• Skip to main content
  • Skip to footer

Rogue Valley Model Railroad Club

Modeling the P&E One Foot at a Time

  • Home
  • About the Club
    • Join the RVMRC
    • Our History
    • Newsletter Archives
    • Meeting Minutes
  • Rosters & Standards
  • The Layout
  • P&E Operations
  • Sunday Public Run Day

The Layout

Ron and Paula Harten put together a set of usable, interactive track diagrams in PDF format. For detailed diagrams, click on names inside the green boxes or scroll down.

Interactive P&E Layout Diagram (pdf)

Below is a collection of beauty shots from around the Pacific & Eastern with some views of the railroad from Medford to Klamath Falls. Photos by Larry Tuttle, except as noted.

Switching the Medco mill complex.
Interchange from SP on the main; snaking through Medco
A local crossing I-5 and Bear Creek
Inside the Pelican Yard Engine Shop
View of the Pelican yard showing the engine service facilities, online car shop and the yard.
East Hauler in deep woods while a log truck waits
Medco #9 headed up to Summit, passing a smaller gypo logging outfit near Butte Falls
Heading east out of Butte Falls at Ginger Creek
Mt. Pitt looms over a cut of loads at Butte Falls
Action at Summit: The Medco "Termite" about to head up the logging branch; the tail end of the East Hauler on the siding.
Westbound Manifest at the East Portal of Tunnel 1.
An Eastbound Hauler crosses a drainage high in the Cascades.
All is quiet on the hill in this view.
Medco 9, aka the Termite, makes his rounds to the log landings above Summit.
Medco 9, aka the Termite, makes his rounds to the log landings above Summit.
West Hauler at East Switch Summit. Logging line above, clear cut below.

Footer

VISIT US

 

CONTACT US

Rogue Valley Model Railroad Club
P. O. Box 1362
Medford, OR 97501-0102

 

FOLLOW US

  • Facebook
  • Instagram
RVMRC Logo

Copyright © 2023 Rogue Valley Model Railroad Club
Website made in Oregon by Silver Rockets